Category: Latest News
-
ERI Sponsors the Acenda Health Travel the World Gala

Check out the ERI team “visiting” the Taj Mahal via green screen at the event!
-
Visit Us at the League of Municipalities Convention!

Environmental Resolutions, Inc. will be at the New Jersey State League of Municipalities November 15-17 at the Atlantic City Convention Center. Visit Us at Booth #714 to meet members of our team! #NJLEAGUE #ENVIRONMENTALRESOLUTIONSINC #ERINJ
-
Medford Bicycle Network, Medford, NJ

Environmental Resolutions, Inc. (ERI) was part of the team of Township representatives responsible for acquiring a Federal TEA-21 grant to connect the Village of Medford with the southern suburban areas of the Township by means of a bicycle network. The bicycle network runs along busy County Routes (Himmelein and Taunton Roads) utilizing striped and signed…
-
Arney’s Mount Pedestrian & Horse Trail, Springfield NJ

Environmental Resolutions, Inc. (ERI) was engaged by Burlington County to perform construction management and construction inspection services for an FHWA-funded project for Phase I of the Arney’s Mount Trail in Springfield Township. The project consisted of constructing a new trailhead access and 2.2-mile loop trail up and around Arney’s Mount, the highest point in Burlington…
-
Medford Sewage Treatment Plant Upgrade, Medford Township, NJ

The upgrade of the Medford Township Wastewater Treatment Plant was initiated in response to a decrease in discharge limits for Phosphorus in the Plant’s 2004 NJPDES Permit. The resulting evaluation of the 1.75 MGD capacity facility revealed numerous design shortcomings from an operational and maintenance perspective, and noted that older portions of the facility were…
-
Structural Evaluation and Asbestos Mold Investigation of Commercial Structure, Mount Holly Township

Environmental Resolutions, Inc. (ERI) was contracted by the Township of Mount Holly to perform a structural evaluation and an asbestos and mold investigation of an abandoned commercial building located at 30 High Street, Mt. Holly NJ. The purpose of the evaluation was to determine what structural deficiencies and/or environmental hazards were present in the building…
-
North Church Street and Centre Street Water Main Replacement, Moorestown, NJ

Environmental Resolutions, Inc. (ERI) provided engineering oversight for the installation of over 6,800 linear feet of 12” and 8” ductile iron watermain. Along with engineering oversight, ERI also coordinated and attended any required meetings with the Township, the County, and contractor. ERI also coordinated with Conrail for the installation of a portion of the water…
-
Sanitary Sewer Cured In Place Lining Project Hamilton Township, Mercer County, NJ

Environmental Resolutions, Inc. (ERI) performed inspection services for the installation of lining of sanitary and storm sewer for Hamilton Township Water Pollution Control Department (WPC), Mercer County, NJ. The poly resin liner was inverted from a refrigerator truck into the sewer main and was inserted into the main by using air pressure. Then, the liner…
-
Sodium Hypochlorite Storage Tank Design, Maryland Chemical Company, Baltimore, Maryland

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut vitae varius erat. In quis lacus sed mi sollicitudin pulvinar eget porttitor tortor. Donec ante orci, efficitur eget congue in, commodo sit amet ex. Mauris iaculis, massa sit amet commodo malesuada, ex velit tincidunt risus, in consectetur ante odio vel tellus. Aenean consectetur semper mauris, sit…
-
Palmyra Cove Nature Park Boardwalk & Observation Pier Rehabilitation Project, Borough of Palmyra, NJ

Environmental Resolutions, Inc. (ERI) is providing engineering design and bidding services for the Palmyra Cove Nature Park Boardwalk and Pier Rehabilitation Project. According to the Palmyra Cove Nature Park Master Plan Update 2019, the piers and boardwalks have been damaged by and clogged from debris large and small carried by the river as well as…