2020 Bid Results

NOTE:  Following the opening of bids, a summary of bids (including a listing of bidders) will be posted on this page as soon as reasonably possible. 

Bid results listed below without a red link have not been posted yet.

Bid results are unofficial.  

9/18/20 – Ballinger Lake Park Improvements, Medford Lakes 24046 00

9/16/20 – Schoolhouse Road Improvement Project, North Hanover Township 23521 20C Bid Summary

9/15/20 – 5th and Race Street Improvement Project, Palmyra Borough 44528 00 Bid Summary

9/15/20 – 2020 Road Improvement Program, Palmyra Borough 44529 00 Bid Summary

9/15/20 – Temple Boulevard Improvement Project, Palmyra Borough 44525 00 Bid Summary

8/25/20 – Resurfacing of Sykesville Road Phase I Improvements, Chesterfield Township 42130 19C Bid Summary

8/20/20 – Landscape Improvements at Greystone Estates, Medford Township 25950 02 Bid Summary

8/20/20 – 2019 Road Improvement Program, Medford Township 25954 19 Bid Summary

8/18/20 – Contract 2020-02 Indigo Drive Watermain Replacement – Phase III, Mount Laurel MUA 21907 00 Bid Summary Results

8/13/20 – Good Farm Recreation Complex Phase II Improvements, Southampton Township 70529_04 Bid Summary

8/12/20 – Bridgeboro Road Phase II – 2020 Road Program, Edgewater Park Township 63055 01 Bid Summary

8/11/20 – Rest Room Addition to the Fenton Lane Park, Chesterfield Township 42133 06 Bid Summary

8/11/20 – Practice Wall, Fenton Lane Park, Chesterfield Township 42133 06 Bid Summary 

8/6/20 – Voorhees Drive Resurfacing Project, Voorhees Township 27130 20A Bid Summary

8/5/20 – 2019 Road Improvements Program, Springfield Township Bid Summary 31368 05B

7/29/20 – FY 2019 CDBG Barrier Removal at the Public Safety and Union Firehouse Bldg, Medford Township 258810 04 Bid Summary

7/23/20 – Collection System Lining Improvement Project, Medford Lakes Borough 2490200 Bid Summary

7/9/20 – On-Call Contractor for Misc. Road and Drainage Reconstruction REBID, Edgewater Park Township 63000 10H Bid Summary

7/8/20 – 2020 Road Improvement Program, Medford Lakes Borough 24035 20 Bid Summary

7/1/20 – Sewer Plant Generator Replacement Project, Riverside SA 30424 90 Bid Summary

6/23/20 – 2020-2021 Electrical Maintenance Contract, Medford Township Utility Division 25001 30B Bid Summary

6/23/20 –2020-2021 General Mechanical Maintenance, Medford Township Utility Division 25001 30A Bid Summary

6/23/20 – 2020-2021 On-Call Contractor for Misc. Utility Reconstruction, Medford Township 25001 30D Bid Summary

6/23/20 – 2020-2021 On-Call TVing and Point Repair Contract, Medford Township Utility Division 25001 30K Bid Summary

6/23/20 – 2020-2021 Public Works On-Call Contractor for Misc. Reconstruction, Medford Township 25972 30 Bid Summary

6/11/20 – Municipal Drive Improvements Phase II, Lumberton Township 70086 00

6/11/20 – Riverton Dog Park Construction, Riverton Borough 38005 00 Bid Summary

5/27/20 – Sanitary Sewer Replacement (for Public Road Pump Station Elimination), Palmyra Borough 44050 00 ReBid Summary

5/12/20 – Medford Township Sewage Plant Improvements Project, Medford Township 258921 Bid Summary

5/7/20 – FY 2019 NJDOT Municipal Aid Grant, West Railroad Ave, Phase I, Eastampton Township 43035 19 Bid Summary

4/21/20 – Construction of the Croft Farm Dog Park, Cherry Hill Township re-bid.  This bid opening was canceled.

4/9/20 – Rotary Sludge Press System, Medford Lakes Borough 24900 01 Bid Summary

4/1/20 – Storage Building Rehabilitation Project, Medford Township 25977 08 Bid Summary

3/24/20 – On-Call Contractor for Misc. Roadway Reconstruction, Drainage, and Maintenance at Township Properties, Edgewater Park Township 63000 10H
This bid opening has been canceled and will be rescheduled at a later date.

3/18/20 – Supply of one (1) Rotary Sludge Press System, Medford Lakes Borough 24900 00  No bids were submitted for this project.

3/10/20 – Sanitary Sewer Replacement for Public Road Pump Station Elimination, Palmyra Borough 44050 00 Rebid Summary

3/5/20 – 2019 Road Improvement Program, Medford Lakes Borough 24035 19 Bid Summary

2/27/20 – Construction of the Croft Farm Dog Park, Cherry Hill Township.
This project was not awarded and will be re-bid.

2/4/20 – Water Treatment Plant and Distribution System Improvements, Burlington City  40008 39 Bid Summary

1/30/20 – West Avenue and Babe Ruth Ball Fields Improvement Project, Delanco Township 39004 05 Bid Summary

1/30/20 – Southside Standpipe Rehabilitation Project, Medford Township 25512 07 Bid Summary

1/22/20 – Keim Street Sanitary Sewer Extension, Edgewater Park Township 63503 01 Bid Summary

1/14/20 – Sanitary Sewer Replacement (for Public Road Pump Station Elimination), Palmyra Borough 44050 00 Bid Summary

1/7/20 – 2020-2021 Supply and Delivery of Various Chemicals for Water and Wastewater Treatment Plants, City of Burlington 40008 09 Bid Summary