NOTE: Following the opening of bids, a summary of bids (including a listing of bidders) will be posted on this page as soon as reasonably possible.
Bid results listed below without a blue link have not been posted yet.
Bid results are unofficial.
12/22/20 – Dayton Avenue Roadway Improvements, Waterford Township 46041 20
11/24/20 – 2021 Maintenance Contract for Borough of Palmyra Sewer Treatment Plant 44000 21 Bid Summary
10/22/20 – Resurfacing of Sykesville Road – Phase III Improvements, Chesterfield Township 42130 20C Bid Summary
10/15/20 – Drainage Improvement Project on Hickory St and Chestnut St, Delanco Two 39007 00 Bid Summary
10/15/20 – Reconstruction of Bunting Bridge Road Phase III, New Hanover Township 23032 19C
10/15/20 – FY2020 NJDOT Mun. Aid Grant, Woodcrest Drive Improvements, Eastampton Township 43035 20
10/9/20 – Ballinger Lake Park Improvements, Phase I, Medford Lakes Township 24046 00 Bid Summary
9/29/20 – 2020-2021 Chemical Supply, Medford Township Utilities Divsion 25001 30H Bid Summary
9/23/20 – Southside Standpipe Rehabilitation Project, Medford Township 25512 07 Rebid Summary
9/18/20 – Ballinger Lake Park Improvements, Medford Lakes 24046 00 This project will be re-bid.
9/16/20 – Schoolhouse Road Improvement Project, North Hanover Township 23521 20C Bid Summary
9/15/20 – 5th and Race Street Improvement Project, Palmyra Borough 44528 00 Bid Summary
9/15/20 – 2020 Road Improvement Program, Palmyra Borough 44529 00 Bid Summary
9/15/20 – Temple Boulevard Improvement Project, Palmyra Borough 44525 00 Bid Summary
8/25/20 – Resurfacing of Sykesville Road Phase I Improvements, Chesterfield Township 42130 19C Bid Summary
8/20/20 – Landscape Improvements at Greystone Estates, Medford Township 25950 02 Bid Summary
8/20/20 – 2019 Road Improvement Program, Medford Township 25954 19 Bid Summary
8/13/20 – Good Farm Recreation Complex Phase II Improvements, Southampton Township 70529_04 Bid Summary
8/12/20 – Bridgeboro Road Phase II – 2020 Road Program, Edgewater Park Township 63055 01 Bid Summary
8/11/20 – Rest Room Addition to the Fenton Lane Park, Chesterfield Township 42133 06 Bid Summary
8/11/20 – Practice Wall, Fenton Lane Park, Chesterfield Township 42133 06 Bid Summary
8/6/20 – Voorhees Drive Resurfacing Project, Voorhees Township 27130 20A Bid Summary
8/5/20 – 2019 Road Improvements Program, Springfield Township Bid Summary 31368 05B
7/23/20 – Collection System Lining Improvement Project, Medford Lakes Borough 2490200 Bid Summary
7/8/20 – 2020 Road Improvement Program, Medford Lakes Borough 24035 20 Bid Summary
7/1/20 – Sewer Plant Generator Replacement Project, Riverside SA 30424 90 Bid Summary
6/23/20 – 2020-2021 Electrical Maintenance Contract, Medford Township Utility Division 25001 30B Bid Summary
6/23/20 –2020-2021 General Mechanical Maintenance, Medford Township Utility Division 25001 30A Bid Summary
6/11/20 – Municipal Drive Improvements Phase II, Lumberton Township 70086 00
6/11/20 – Riverton Dog Park Construction, Riverton Borough 38005 00 Bid Summary
5/12/20 – Medford Township Sewage Plant Improvements Project, Medford Township 258921 Bid Summary
4/21/20 – Construction of the Croft Farm Dog Park, Cherry Hill Township re-bid. This bid opening was canceled.
4/9/20 – Rotary Sludge Press System, Medford Lakes Borough 24900 01 Bid Summary
4/1/20 – Storage Building Rehabilitation Project, Medford Township 25977 08 Bid Summary
3/24/20 – On-Call Contractor for Misc. Roadway Reconstruction, Drainage, and Maintenance at Township Properties, Edgewater Park Township 63000 10H
This bid opening has been canceled and will be rescheduled at a later date.
3/18/20 – Supply of one (1) Rotary Sludge Press System, Medford Lakes Borough 24900 00 No bids were submitted for this project.
3/5/20 – 2019 Road Improvement Program, Medford Lakes Borough 24035 19 Bid Summary
2/27/20 – Construction of the Croft Farm Dog Park, Cherry Hill Township.
This project was not awarded and will be re-bid.
2/4/20 – Water Treatment Plant and Distribution System Improvements, Burlington City 40008 39 Bid Summary
1/30/20 – West Avenue and Babe Ruth Ball Fields Improvement Project, Delanco Township 39004 05 Bid Summary
1/30/20 – Southside Standpipe Rehabilitation Project, Medford Township 25512 07 Bid Summary
1/22/20 – Keim Street Sanitary Sewer Extension, Edgewater Park Township 63503 01 Bid Summary