Tag: buttonwood lake
-
Buttonwood Lake Project

ERI was on-site for construction inspection of the delivery, assembly and setting of the 10-foot wide, 120-foot span, and approximately 30,000 pound, prefabricated steel bridge (constructed by Contech Engineered Solutions) at Buttonwood Lake in Mount Holly, NJ. The assembly and setting of the bridge was completed by Capela Construction Inc., and Dobbs Crane Rentals. The…




