Medford Bicycle Network

Serving as Medford Township Engineer, ERI’s Chris Noll was part of the team of Township representatives responsible for acquiring a Federal TEA-21 grant whose goal was to connect the Village of Medford with the southern suburban areas of the Township by means of a bicycle network along Stokes Road (County Route 541), Himmelein Road (County … More Medford Bicycle Network

Helping municipalities, non-profit organizations, and redevelopment organizations apply for HDSRF funds

ERI is working with several Southern New Jersey municipalities to apply for HDSRF.  Pictured here is Glassboro Borough, showing before and after photos of the Town Square. LSRPs (Licensed Site Remediation Professionals) at ERI are working with several municipalities and non-profits to apply for grants to investigate and remediate contaminated properties. The New Jersey Department … More Helping municipalities, non-profit organizations, and redevelopment organizations apply for HDSRF funds

Site Investigation and Asbestos Survey

Environmental Resolutions, Inc. (ERI) was contracted to perform a Site Investigation and Asbestos Survey for The Cinnaminson Home, a three-story old farmhouse with an attached two-story brick addition. The property has been vacant for several years but was previously used as senior housing. ERI also performed the Phase I Environmental Site Assessment/Preliminary Assessment, and prior … More Site Investigation and Asbestos Survey

Fairview Standpipe Rehabilitation Project

Environmental Resolutions Inc. lead the rehabilitation of the 400,000-gallon standpipe located off of Fairview Road in Medford Township, New Jersey. Work consisted of homeland security improvements, equipment upgrades, tank cleaning, lead-based paint abatement, and repainting of the tank interior and exterior. In addition to the tank rehabilitation, improvements were made to the utility vault on … More Fairview Standpipe Rehabilitation Project

Erial-Clementon Road, Phase I

Environmental Resolutions, Inc. (ERI) is providing construction management and inspection during improvements to Erial-Clementon Road (CR 703), Phase I, Gloucester Township and Pine Hill Boro, for the Department of Engineering, Office of Camden County Public Works. This project is located between Erial-New Brooklyn Road (CR 706) and Turnersville-Hickstown Road.  The project is a full-depth reconstruction of an existing concrete … More Erial-Clementon Road, Phase I

Glassboro Town Square

ERI has been retained as LSRP of Record for the Glassboro Town Square project, which connects the Borough’s downtown area with Rowan University. The property had previously been used for a variety of industrial and commercial uses, including a glass factory, sewing factory, and firehouse. ERI completed a Remedial Investigation/Area of Concern Remedial Action Report, which detailed … More Glassboro Town Square

Burlington Township High School

Environmental Resolutions, Inc. (ERI) was retained by the Burlington Township Board of Education to provide site engineering, construction management, and inspection services for the resurfacing of the High School Stadium Athletic Track and the improvements to the High School Parking Lot, both under the 2016 Referendum. The athletic track project consisted of the resurfacing of the existing … More Burlington Township High School

Springdale Road Roadway Improvements Phase II, Cherry Hill Township

ERI’s Jeremy Noll was Resident Engineer and John Potts was Lead Inspector during the construction of Springdale Road (CR 673) Roadway Improvements Phase II, which was a federally funded project in Cherry Hill Township. Phase II improvements were made from Evesham Road (CR 544) to Wilderness Drive.  ERI provided construction management and inspection services for … More Springdale Road Roadway Improvements Phase II, Cherry Hill Township

Survey, Winslow Township

ERI’s Survey Party Chief Ethan Hyder conducted a topography of an existing basin in Winslow Township for Warren Distribution Company South for a proposed dredging and sand filling. The transit is resting on three grade stakes under the water so it stays level as the entire perimeter was fully obstructed, and the only line of … More Survey, Winslow Township

Cliver Park, Eastampton NJ

Enjoy the beautiful weather by visiting Cliver Park in Eastampton, NJ!  ERI’s Stacey Arcari has been working with Eastampton Township to secure grant funding and design multiple phases of improvements at Cliver Park. To enhance Cliver Park, ERI designed a parking lot expansion and an ADA accessible multi-use path around the entire park. The path … More Cliver Park, Eastampton NJ