Burlington Township High School

Environmental Resolutions, Inc. (ERI) was retained by the Burlington Township Board of Education to provide site engineering, construction management, and inspection services for the resurfacing of the High School Stadium Athletic Track and the improvements to the High School Parking Lot, both under the 2016 Referendum.

The athletic track project consisted of the resurfacing of the existing running track, long jump, and high jump using a polyurethane long life granulated surface.  The project also included drainage improvements to both the running track and the interior football field by performing soil amendments and installing an underdrain system.  A new Emergency Vehicle Parking Area was also added adjacent to the stadium track.

The parking lot project consisted of storm drainage improvements, resurfacing of the main parking lot, gym parking lot, and interior access drives, curb and sidewalk repairs, and ADA improvements.